ASCE Research Library
<A> Journal of
Management in Engineering October 2008
Performance Evaluation of
Construction Enterprise Resource Planning Systems /
Omer Tatari,
Daniel
Castro-Lacouture, and
Miros aw J.
Skibniewski |
Competitive
Positioning and Continuity of Construction Firms in International
Markets /
Sinem Korkmaz
and
John I.
Messner |
Critical Issues
and Possible Solutions for Motivating Foreign Construction Workers /
Seung H. Han,
Sang H. Park,
Eui J. Jin,
Hyoungkwan
Kim, and
Yeon K. Seong |
Partnering the
Construction of a Swedish Pharmaceutical Plant: Case Study /
Per Erik
Eriksson and
TorBjörn
Nilsson |
Collaboration
Environments for Construction: Implementation Case Studies /
Bilge Erdogan,
Chimay J.
Anumba,
Dino
Bouchlaghem, and
Yasemin
Nielsen |
Agent-Based
Construction Supply Chain Simulator (CS2) for
Measuring the Value of Real-Time Information Sharing in Construction
/
Jung Ung Min
and
Hans C.
Bjornsson |
Marketing
Practices of U.S. Contractors /
David Arditi,
Gul Polat,
and
Samuel A.
Makinde |
Enhancing Value
in Crucial Decisions: Line 9 of the Barcelona Subway /
Gaizka
Ormazabal,
Bernat
Viñolas, and
Antonio
Aguado |
<B>Journal of
Architectural Engineering September 2008
<C>Journal of
Construction Engineering and Management October 2008
Development of a
Quantification Proposal for Hidden Quality Costs: Applied to the
Construction Sector /
Manuel E.
Sansalvador Sellés,
Jose A.
Cavero Rubio, and
Javier Reig
Mullor |
Single versus
Multiple Prime Contracting /
Eddy M. Rojas |
Heterogeneous
Approach to Modeling Contractors' Decision-to-Bid Strategies /
Bee-Lan Oo,
Derek S. Drew,
and
Hing-Po Lo |
Areas of
Application for 3D and 4D Models on Construction Projects /
Timo Hartmann,
Ju Gao,
and
Martin
Fischer |
Measuring and
Modeling Labor Productivity Using Historical Data /
Lingguang
Song and
Simaan M.
AbouRizk |
Craft Training
Issues in American Industrial and Commercial Construction /
Yinggang Wang,
Paul M.
Goodrum,
Carl T. Haas,
and
Robert W.
Glover |
Social Network
Model of Construction /
Paul
Chinowsky,
James
Diekmann, and
Victor
Galotti |
Project
Performance Evaluation Based on Statistical Process Control
Techniques /
Sou-Sen Leu
and
You-Che Lin |
Dynamic
Programming Approach to Optimization of Site Remediation /
W. Eric
Showalter and
Daniel W.
Halpin |
<D>Journal of
Infrastructure Systems September 2008
Weighted Scoring
Model for Resource Allocation in Postconflict Reconstruction /
Lora M.
Carroll,
John V. Farr,
and
Timothy A.
Trainor |
Time and Cost
Saving Strategies for Water Pipe Lining Operations /
Thomas D.
Rockaway and
R. Timothy
Ball |
Stochastic
Duration Modeling of Pavement Overlay Crack Initiation /
Ziad S. Nakat
and
Samer M.
Madanat |
Municipal
Infrastructure Asset Levels of Service Assessment for Investment
Decisions Using Analytic Hierarchy Process /
Vishal Sharma,
Mohamed
Al-Hussein,
Hassan
Safouhi, and
Ahmed
Bouferguène |
Levee Performance
Assessment Methods Integrated in a GIS to Support Planning
Maintenance Actions /
Damien Serre,
Laurent
Peyras,
Rémy Tourment,
and
Youssef Diab |
Integrated
Life-Cycle Assessment and Life-Cycle Cost Analysis Model for
Concrete Bridge Deck Applications /
Alissa
Kendall,
Gregory A.
Keoleian, and
Gloria E.
Helfand |
Impact Assessment
and Remediation Strategies for Roadway Construction in Acid-Bearing
Media: Case Study from Mid-Appalachia /
Roger C.
Viadero, Jr.,
Ronald H.
Fortney, and
Aislinn T.
Creel |
Full-Scale
Experimental Determination of Concrete Pipe Joint Behavior and Its
Modeling /
Jasmin Buco,
Fabrice
Emeriault, and
Richard
Kastner |
Community
Investment Programs in Developing Country Infrastructure Projects /
Robert H.
Montgomery,
Angelito
Palma, and
Hilary
Hoagland-Grey |
Agent-Based
Modeling: Approach for Improving Infrastructure Management /
K. L. Sanford
Bernhardt and
S. McNeil |
Alternative
Transportation Fuels: Distribution Infrastructure for Hydrogen and
Ethanol in Iowa /
Heather L.
Wakeley,
W. Michael
Griffin,
Chris
Hendrickson, and
H. Scott
Matthews |
Discussion of
“Prediction of Water Pipe Asset Life Using Neural Networks” by D.
Achim, F. Ghotb, and K. J. McManus /
Osama Moselhi
and
Mohamed Fahmy |
2.ScienceDirect
<A> Automation in
Construction November 2008
Integrating
3D laser scanning and photogrammetry for progress measurement of
construction work
Samir
El-Omari, Osama Moselhi |
The use of
artificial neural networks in adiabatic curves modeling
Gregor
Trtnik, Franci Kavčič,
Goran Turk |
Combination
of radio frequency identification (RFID) and field verification
tests of interior decorating materials
Chun-Ta
Tzeng, Yi-chang Chiang, Che-ming Chiang, Chi-ming Lai |
Time/cost
optimization using hybrid evolutionary algorithm in construction
project scheduling
Magdalena Rogalska, Wojciech Bożejko,
Zdzisław Hejducki |
Integration
of cost and schedule using extensive matrix method and spreadsheets
Po-Han
Chen |
Learning from
risks: A tool for post-project risk assessment
I.
Dikmen, M.T. Birgonul, C. Anac, J.H.M. Tah, G. Aouad |
Historical
photography-based computer-aided architectural design: Demolished
buildings information modeling with reverse engineering
functionality
Athanasios D. Styliadis |
IFC and
building lifecycle management
Renaud
Vanlande, Christophe Nicolle, Christophe Cruz |
Multi-objective simulation-optimization for earthmoving operations
Hong
Zhang |
Defect
detection of concrete structures using both infrared thermography
and elastic waves
Chia-Chi
Cheng, Tao-Ming Cheng, Chih-Hung Chiang |
<B>
International Journal of Project Management August 2008
Managing
public–private megaprojects: Paradoxes, complexity, and project
design
Alfons
van Marrewijk, Stewart R. Clegg, Tyrone S. Pitsis, Marcel Veenswijk |
A
multicriteria satisfaction analysis approach in the assessment of
operational programmes
Pandelis G. Ipsilandis, George Samaras, Nikolaos Mplanas |
A method of
project selection based on capital asset pricing theories in a
framework of mean–semideviation behavior
Babak
Jafarizadeh, Reza Ramazani Khorshid-Doust |
Leadership
for future construction industry: Agenda for authentic leadership
Shamas-ur-Rehman Toor, George Ofori |
Towards
developing competency-based measures for construction project
managers: Should contextual behaviours be distinguished from task
behaviours?
Divine
Kwaku Ahadzie, David Gavin Proverbs, Paul Olomolaiye |
Modeling the
supply chain configuration problem with resource constraints
Haitao
Li, Keith Womer |
Conceptual
determinants of construction project management competence: A
Chinese perspective
Ping
Chen, David Partington, Jia Ning Wang |
Delays in
construction projects: The case of Jordan
G.
Sweis, R. Sweis, A. Abu Hammad, A. Shboul |
Critical
success criteria for mass house building projects in developing
countries
D.K.
Ahadzie, D.G. Proverbs, P.O. Olomolaiye |
Fuzzy
critical chain method for project scheduling under resource
constraints and uncertainty
Luong Duc Long,
Ario Ohsato |
|