1.ASCE Research Library
<A> Journal of Management in Engineering October 2008
1. Performance Evaluation of Construction Enterprise Resource Planning Systems |
2. Competitive Positioning and Continuity of Construction Firms in International Markets |
3. Critical Issues and Possible Solutions for Motivating Foreign Construction Workers |
4. Collaboration Environments for Construction: Implementation Case Studies |
<B>Journal of Architectural Engineering September 2008
1.
Optimizing the Wind Uplift Resistance of Mechanically Attached Roof Systems
|
2.
Developing O&M Plans for Homeowners Associations: Case Study |
3.
Bracing Demand in Axially Loaded Cold-Formed Steel Stud Walls
|
<C>Journal of Construction Engineering and Management October 2008
1.Development of a Quantification Proposal for Hidden Quality Costs: Applied to the Construction Sector
|
2. Areas of Application for 3D and 4D Models on Construction Projects
|
3. Heterogeneous Approach to Modeling Contractors' Decision-to-Bid Strategies |
4. Craft Training Issues in American Industrial and Commercial Construction |
5. Project Performance Evaluation Based on Statistical Process Control Techniques |
6. Dynamic Programming Approach to Optimization of Site Remediation |
<D>Journal of Infrastructure Systems September 2008
1.
Weighted Scoring Model for Resource Allocation in Postconflict Reconstruction
|
2.
Time and Cost Saving Strategies for Water Pipe Lining Operations
|
3.
Stochastic Duration Modeling of Pavement Overlay Crack Initiation |
4.
Integrated Life-Cycle Assessment and Life-Cycle Cost Analysis Model for Concrete Bridge Deck Applications |
5.
Agent-Based Modeling: Approach for Improving Infrastructure Management |
2. ScienceDirect
<A> Automation in Construction October 2008
1.
The practicalities of transferring data between project collaboration systems used by the construction industry |
2.
A simulation model for studying the implementation of performance-based fire safety design in buildings |
3.
Identification of application areas for Augmented Reality in industrial construction based on technology suitability |
4.
Modeling subcontractor registration decisions through case-based reasoning approach |
<B> International Journal of Project Management October 2008
1.
An experimental investigation of factors influencing perceived control over a failing IT project |
2.
Managing user expectations on software projects: Lessons from the trenches |
3.
Achieving IT project success through control, measurement, managing expectations, and top management support |
4.
Improving project management performance of large contractors using benchmarking approach |
|