1.
Rework in Civil Infrastructure Projects: Determination of Cost
Predictors |
2. Owners Respond:
Preferences for Task Performance, Delivery Systems, and Quality
Management |
3. Concept
Relation Extraction from Construction Documents Using Natural
Language Processing |
4. Multiagent
System for Construction Dispute Resolution (MAS-COR) |
5. Dynamic
Knowledge-Based Process Integration Portal for Collaborative
Construction |
| 6. Innovation Diffusion Modeling in
the Construction Industry |
| 7. Positive Psychological Capital as
a Source of Sustainable Competitive Advantage for Organizations |
| 8. Inter- and Intraorganizational
Trust in International Construction Joint Ventures |
| 9. Probabilistic Approach for
Budgeting in Portfolio of Projects |
| 10. Improved Baseline Productivity
Analysis Technique |
| 11. Study of Real Options with
Exogenous Competitive Entry to Analyze Dispute Resolution Ladder
Investments in Architecture, Engineering, and Construction Projects |
| 12. Models for Managing Contingency
Construction Operations |
1. Comparative
Assessment of Civil Infrastructure Network Performance under
Probabilistic and Scenario Earthquakes |
2. Optimal Maintenance and
Repair Policies under Nonlinear Preferences |
3. Data and Modeling Issues
Faced during the Efficiency Measurement of Road Maintenance
Using Data Envelopment Analysis |
4. Efficiency Measurement of
Bridge Maintenance Using Data Envelopment Analysis |
| 5.Life-Cycle Perspective on Residential Water
Conservation Strategies |
| 6.Multicriteria Decision-Making Approach for
Highway Slope Hazard Management |
| 7.Methodology for Bayesian Belief Network
Development to Facilitate Compliance with Water Quality Regulations |
| 8.Rank Correlation Method for Evaluating Manual
Pavement Distress Data Variability |
| 9.Probability of Failure Analysis due to Internal
Corrosion in Cast-Iron Pipes |
| 10.Addressing Sustainability in Benchmarking
Framework for Indian Urban Water Utilities |
11.Determinants of Industry
Acceptance for Highway Warranty Contracts: Alabama Case Study |
| 1.Overview of HVAC system simulation |
| 2.Traction efficiency of a wheeled tractor in
construction operations |
| 3.Optimizing the utilization of multiple labor
shifts in construction projects |
| 4.Assessing contractor selection criteria weights
with fuzzy AHP method application in group decision environment |
| 5.Case study analysis of risk from using
excavators as ‘cranes’ |
| 6.Towards an autonomous real-time tracking system
of near-miss accidents on construction sites |
| 7.Value creating construction virtual teams: A
case study in the construction sector |
| 8.An evaluation of the applicability of 4D CAD on
construction projects |
| 9.Middleware for heterogeneous subsystems
interoperability in intelligent buildings |
| 10.Technology development needs for advancing
Augmented Reality-based inspection |
| 11.Rule-based intelligence for domotic
environments |
| 12.A web-based system for design interface
management of construction projects |
| 13.Research on the system configuration and
energy control strategy for parallel hydraulic hybrid loader |
| 14.Optimizing the planning of construction site
security for critical infrastructure projects |
| 15.Sustainable performance criteria for
construction method selection in concrete buildings |
| 16.A service oriented framework for construction
supply chain integration |
| 17.Construction, application and validation of
selection evaluation model (SEM) for intelligent HVAC control system |
| 18.XPDRL project: Improving the project
documentation quality in the Spanish architectural, engineering and
construction sector |
| 1.Examination of the best, analogous,
competing terms to describe value in construction projects |
| 2.The Project Involvement Index, psychological
distress, and psychological well-being: Comparing workers from
projectized and non-projectized organizations |
| 3.The moral responsibility of project
selectors |
| 4.Task completion competency and
project management performance: The influence of control and user
contribution |
| 5.Beyond the ‘iron triangle’:
Stakeholder perception of key performance indicators (KPIs) for
large-scale public sector development projects |
| 6.Icarus’ predicament: Managing the
pathologies of overspecification and overdesign |
| 7.Deliberate ignorance in project
risk management |
| 8.A project contingency framework
based on uncertainty and its consequences |
| 9.Performance metric development for
pharmaceutical construction projects |
| 10.Centralized bid evaluation for
awarding of construction projects – A case of India government |
| 11.The awareness and practice of
value management by South African consulting engineers: Preliminary
research survey findings |
| 12.Evaluating satisfaction with PCM
services for school construction: A case study of primary school
projects |
| 13.Announcement: Call for
applications, IPMA Research Awards 2010 |