1. Drivers for
Adopting Public Private Partnerships—Empirical Comparison
between China and Hong Kong Special Administrative Region |
2. Strategies for Design-Build
in Korea Using System Dynamics Modeling |
3. Impact of Inaccurate
Engineer's Estimated Quantities on Unit Price Contracts |
4. Whole Life Performance
Assessment: Critical Success Factors |
5. Stochastic
Time-Cost-Resource Utilization Optimization Using Nondominated
Sorting Genetic Algorithm and Discrete Fuzzy Sets |
6. Optimizing Resource Leveling in Construction
Projects |
7. Case-Based Reasoning for Construction Hazard
Identification: Case Representation and Retrieval |
8. Model for Predicting Financial Performance of
Development and Construction Corporations |
9. Chinese Contractors in
Africa: Home Government Support, Coordination Mechanisms, and
Market Entry Strategies |
1. Comparative
Assessment of Civil Infrastructure Network Performance under
Probabilistic and Scenario Earthquakes |
2. Optimal Maintenance and
Repair Policies under Nonlinear Preferences |
3. Data and Modeling Issues
Faced during the Efficiency Measurement of Road Maintenance
Using Data Envelopment Analysis |
4. Efficiency Measurement of
Bridge Maintenance Using Data Envelopment Analysis |
5.Life-Cycle Perspective on Residential Water
Conservation Strategies |
6.Multicriteria Decision-Making Approach for
Highway Slope Hazard Management |
7.Methodology for Bayesian Belief Network
Development to Facilitate Compliance with Water Quality Regulations |
8.Rank Correlation Method for Evaluating Manual
Pavement Distress Data Variability |
9.Probability of Failure Analysis due to Internal
Corrosion in Cast-Iron Pipes |
10.Addressing Sustainability in Benchmarking
Framework for Indian Urban Water Utilities |
11.Determinants of Industry
Acceptance for Highway Warranty Contracts: Alabama Case Study |
1.Overview of HVAC system simulation |
2.Traction efficiency of a wheeled tractor in
construction operations |
3.Optimizing the utilization of multiple labor
shifts in construction projects |
4.Assessing contractor selection criteria weights
with fuzzy AHP method application in group decision environment |
5.Case study analysis of risk from using
excavators as ‘cranes’ |
6.Towards an autonomous real-time tracking system
of near-miss accidents on construction sites |
7.Value creating construction virtual teams: A
case study in the construction sector |
8.An evaluation of the applicability of 4D CAD on
construction projects |
9.Middleware for heterogeneous subsystems
interoperability in intelligent buildings |
10.Technology development needs for advancing
Augmented Reality-based inspection |
11.Rule-based intelligence for domotic
environments |
12.A web-based system for design interface
management of construction projects |
13.Research on the system configuration and
energy control strategy for parallel hydraulic hybrid loader |
14.Optimizing the planning of construction site
security for critical infrastructure projects |
15.Sustainable performance criteria for
construction method selection in concrete buildings |
16.A service oriented framework for construction
supply chain integration |
17.Construction, application and validation of
selection evaluation model (SEM) for intelligent HVAC control system |
18.XPDRL project: Improving the project
documentation quality in the Spanish architectural, engineering and
construction sector |
1.Examination of the best, analogous,
competing terms to describe value in construction projects |
2.The Project Involvement Index, psychological
distress, and psychological well-being: Comparing workers from
projectized and non-projectized organizations |
3.The moral responsibility of project
selectors |
4.Task completion competency and
project management performance: The influence of control and user
contribution |
5.Beyond the ‘iron triangle’:
Stakeholder perception of key performance indicators (KPIs) for
large-scale public sector development projects |
6.Icarus’ predicament: Managing the
pathologies of overspecification and overdesign |
7.Deliberate ignorance in project
risk management |
8.A project contingency framework
based on uncertainty and its consequences |
9.Performance metric development for
pharmaceutical construction projects |
10.Centralized bid evaluation for
awarding of construction projects – A case of India government |
11.The awareness and practice of
value management by South African consulting engineers: Preliminary
research survey findings |
12.Evaluating satisfaction with PCM
services for school construction: A case study of primary school
projects |
13.Announcement: Call for
applications, IPMA Research Awards 2010 |